Current Project (International & Malaysia)

1. TAGUM, MINDANAO, PHILIPPINES : River Bank Filtration (RBF) using Horizontal Collector Well (HCW) for Tagum Bulk Water Supply Project.

Project Owner: TAGUM WATER COMPANY INC. PHILIPPINES.

Project Status : On-Going 2018

-Scope of work : RBF site-specific design and HCW construction supervision.

2. “The Feasibility Study of Source Work Development Programme in Kelantan”

Project Owner: Air Kelantan Sdn Bhd (AKSB)

Client: PZK -Artelia-Just Consult Consortium

Project Status : Completed October 2018

-Scope of work : Geo-Technical Investigation, Test Well and Pumping Test ,Downhole Logging & HydroGeology Investigations works.

3. HydroGeological Investigation Study for PUTRAJAYA Groudwater Project

Client:Perbadanan Putrajaya (PPj);Kementerian Wilayah Persekutuan(KWP)

Project Status : Completed September 2017

The main objective of this study is to gather all the important data (Geological, aquifer properties, Groundwater Modelling, Water quality & chemistry) at the proposed site, in order to conclude the findings for Horizontal Collector Well construction, using River Bank Filtration (RBF).

20161005_100015

20160524_111955

4. Soil Investigation and Downhole Logging at UEDA Plating (M) Sdn Bhd

Client:UEDA Plating (M) Sdn Bhd, Shah Alam, Selangor

Project Status : Completed April 2017

5. Tagum-Magdum  HydroGeological Investigation, Davao, Philippines.

(Client : Manila Water Inc.)

Project Status : Completed July 2015

The main objective of this study is to gather all the important data (Geological, aquifer properties, Groundwater Modelling, Water quality & chemistry) at the proposed site, in order to conclude the findings for Horizontal Collector Well construction, using River Bank Filtration (RBF).

6 .Kg. Semuba Pasir Mas  HydroGeological Investigation, Kelantan.

(Client : ECER, RekaRunding, AKSB)

Project Status : Completed Jan 2015

River Bank Filtration Study (RBF) and Horizontal Collector Well (HCW)

 

7.Pintu Geng  HydroGeological Investigation, Kelantan.

(Client : SALCON, AKSB)

Project Status : Completed  Dec 2014

River Bank Filtration Study (RBF) and Horizontal Collector Well (HCW)

 

8.Merbau Chondong HydroGeological Investigation, Kelantan

(Client :RekaRunding, AKSB)

Project Status : Completed July 2014

River Bank Filtration Study (RBF) and Horizontal Collector Well (HCW)

101_6753 IMG_20140605_115426

 

9. Soil Investigation Work at TW 8 at CANON Opto, Shah Alam.

Project Status: Completed July 2014

 

10. Downhole Logging & Soil Work at TW 6 and TW 7 at CANON Opto, Shah Alam.

Project Status : Completed June 2014

 

11. Hydro-Geological Investigation Study for Zone 4D, Wakaf Bharu, Kelantan

(Client :RekaRunding, AKSB)

The main objective of this study is to gather all the important data (Geological, aquifer properties, water quality) in the proposed site, in order to conclude the findings for Horizontal Collector Well construction

Project Status : Completed May 2012

Monitoring of the Water Level using Schlumberger Mini Diver (Automatic Recorder)

In-Situ water quality measurement using WTW 3430 Multimeter which measure:

  • temperature [oC]
  • conductivity [mS/m]
  • pH
  • oxygen [mg/L] and oxygen saturation [%]
  • redox-potential [mV)

Our Climatological Research Stationis a full electronic weather station which measures, calculates and logs:

  • air temperature[oC]
  • rainfall P[mm]
  • wind speed and wind direction [km/h and odegree]
  • solar radiation [W/m2]
  • relative humidity [%]
  • evapotranspiration ET [mm] by using the PENMAN-MONTEITH-equation
  • dewpoint [oC].

12. HydroGeological Investigation Study for  Pasir Tumboh HCW project

(Client :RekaRunding, AKSB)

The main objective of this study is to gather all the important data (Geological, aquifer properties, water quality) in the proposed site, in order to conclude the findings for Horizontal Collector Well construction, using River Bank Filtration (RBF).

Project Status : Completed June 2012

Aquifer Test : 100 hour of Pumping Test with Q of 1.4 MLD

In-Situ Surface Water Quality Measurement at Sg.Pengkala Datu

Construction of Monitoring Well using Flushing Method