Current Project (International & Malaysia)

1. HydroGeological Investigation Study for PUTRAJAYA Groudwater Project

Client:Perbadanan Putrajaya (PPj);Kementerian Wilayah Persekutuan(KWP)

Project Status : On-going (To be completed by March 2017)

The main objective of this study is to gather all the important data (Geological, aquifer properties, Groundwater Modelling, Water quality & chemistry) at the proposed site, in order to conclude the findings for Horizontal Collector Well construction, using River Bank Filtration (RBF).

20161005_100015

20160524_111955

 

 

2. Tagum-Magdum  HydroGeological Investigation, Davao, Philippines.

(Client : Manila Water Inc.)

Project Status : Completed July 2015

The main objective of this study is to gather all the important data (Geological, aquifer properties, Groundwater Modelling, Water quality & chemistry) at the proposed site, in order to conclude the findings for Horizontal Collector Well construction, using River Bank Filtration (RBF).

3 .Kg. Semuba Pasir Mas  HydroGeological Investigation, Kelantan (ECER, for HCW)

Project Status : Completed Jan 2015

 

4.Pintu Geng  HydroGeological Investigation, Kelantan (AKSB, for HCW)

Project Status : Completed  Dec 2014

 

5.Merbau Chondong HydroGeological Investigation, Kelantan (AKSB, for HCW)

Project Status : Completed July 2014

101_6753 IMG_20140605_115426

 

6. Soil Investigation Work at TW 8 at CANON Opto, Shah Alam.

Project Status: Completed July 2014

 

7. Downhole Logging & Soil Work at TW 6 and TW 7 at CANON Opto, Shah Alam.

Project Status : Completed June 2014

 

8. Hydro-Geological Investigation Study for Zone 4D, Wakaf Bharu, Kelantan

The main objective of this study is to gather all the important data (Geological, aquifer properties, water quality) in the proposed site, in order to conclude the findings for Horizontal Collector Well construction

Project Status : Completed May 2012

 

Monitoring of the Water Level using Schlumberger Mini Diver (Automatic Recorder)

In-Situ water quality measurement using WTW 3430 Multimeter which measure:

  • temperature [oC]
  • conductivity [mS/m]
  • pH
  • oxygen [mg/L] and oxygen saturation [%]
  • redox-potential [mV)

Our Climatological Research Stationis a full electronic weather station which measures, calculates and logs:

  • air temperature[oC]
  • rainfall P[mm]
  • wind speed and wind direction [km/h and odegree]
  • solar radiation [W/m2]
  • relative humidity [%]
  • evapotranspiration ET [mm] by using the PENMAN-MONTEITH-equation
  • dewpoint [oC].

9. HydroGeological Investigation Study for AKSB Pasir Tumboh HCW project

The main objective of this study is to gather all the important data (Geological, aquifer properties, water quality) in the proposed site, in order to conclude the findings for Horizontal Collector Well construction, using River Bank Filtration (RBF).

Project Status : Completed June 2012

Aquifer Test : 100 hour of Pumping Test with Q of 1.4 MLD

In-Situ Surface Water Quality Measurement at Sg.Pengkala Datu

Construction of Monitoring Well using Flushing Method